Calgary is blessed with almost 1,000 km of pathways (one of the world’s largest urban pathways) used by pedestrians, runners and cyclists year-round. One of the key elements of the pathways system are it's pedestrian bridges which range from “plain jane” functional bridges to multi-million dollar iconic bridges designed by world renowned architects. The main pedestrian bridge crossing the north side of the bow river into downtown is the World Famous Peace Bridge which just recently celebrated it's 5 year Anniversary.
Quick Facts on the Peace Bridge ;
Length: 126 Metres
Total Construction Costs: $24.5 Million (2012)
Daily Users: 8,000
Cost for Replacement Lighting: $700,000
The Peace bridge remains a big attraction for visitors to our city.
The History....
The Calatrava (the world famous Spanish architect Santiago Calatrava was the designer) Bridge, which later became the Peace Bridge had very strict requirements because of the environmental sensitivity of the Bow River (one of the great fly fishing rivers in the world), no piers in the water (in an effort to minimize the ecological footprint) and restricted height (due to the nearby heliport). The bridge also had to meet the following specifications:
- Withstand Calgary's one-in-100 year flood cycle (who knew this would happen only one year after its completion)
- Minimum 75-year life span
- Barrier free access for people of all mobility types
- Sufficient light so public felt comfortable and secure at all times
The candy cane red Peace Bridge name references the fact the bridge’s north side is on Memorial Drive, a boulevard that pays homage to Canada’s war and peacekeeping efforts over the past 100+ years. At the same time as the bridge was being built, Memorial Drive received a major makeover, creating a much more ceremonial street complete with the new Poppy Plaza, public art and ornamental lighting and decorative boulevard. The bridge was steeped in controversy from day one for several reasons. The cost ($20M+ was deemed too high by many for a pedestrian/cycling bridge). Why was it sole sourced? Why no pubic engagement? Was it even needed? And then there were the delays. An independent inspection company was engaged to inspect all of the welds completed in Spain. Red flags were raised about the aesthetics and safety of the welds, which resulted in all the welds being ground down and redone on site. The bridge sat on the riverbank for months - covered in orange tarps like some Christo artwork - while welders redid all of the welds. Funding for the Peace Bridge was provided through the City of Calgary’s Transportation Infrastructure Investment Program (TIIP), which defines the priority and timing of major infrastructure construction projects. One of the key elements of this program is to foster more pedestrian and cycling opportunities in high-density areas where these modes are more efficient at moving people, supporting land use and lessening environmental impacts. The final costs were $19.8M for construction, $3.45M for architectural and structural design and specialized and $1.25M in administration, quality assurance and insurance for a total of #24.5M.The Peace Bridge is 126 meters long and 6 meters wide, making it twice as wide as a normal pedestrian bridge, allowing separate pedestrian and cycling lanes (not that you would know it as pedestrians walk wherever they want). It is well lit to promote nighttime use. The bridge originally to be opened in fall of 2010 didn’t open until March 2012.